Hitachi Unified Compute Platform HC (UCP HC) Series | Hitachi Vantara
Hamburger Hamburger Hamburger
en_asean
Hitachi Unified Compute Platform HC

Cloud Transformation with HCI.

Accelerate value from the hybrid cloud and simplify management with a proven hyperconverged infrastructure designed for automation and intelligence.

Low-latency, scale, and management simplicity with Trusted hyperconverged infrastructure powered by VMware vSAN

Watch Video Watch the Video

0

Unified management software

Single control plane to manage HCI, turnkey cloud foundation solution, and three-tier converged infrastructure

0%

Faster time to production

Advanced automation technologies to accelerate IT provisioning

0

Scalable infrastructure for all apps

Enterprise scale to power general-purpose workloads, edge, and IoT applications

Explore Explore Explore

Cloud Operating Model Everywhere

Integrated Turnkey Appliance
Faster time to production with ready-to-deploy appliance so you focus more on innovation not infrastructure.
Read Data Sheet
Low-latency Infrastructure for Critical Apps
Powered by industry-leading processors and all-NVMe SSDs, Hitachi HCI appliances are ideal for latency-sensitive applications.
Read the Infographic
Configuration Flexibility
Design the right-sized cloud infrastructure with a wide range of compute and storage options. Start small and scale with HCI appliance powered by the modern Intel Xeon and NVIDIA graphics processors.
Watch the Video
Automated Lifecycle Management
Advanced automation to stay up to date with one-push non-disruptive software and hardware upgrades across the stack.
Read Point of View
Enterprise-Grade Data Protection
Native and optimized data protection to ensure continuous operations.
Read Design Guide

What is Hybrid Cloud Solution?

Online demo to learn more about Hitachi’s hybrid cloud infrastructure solution

Watch the Demo
Dis-Chem

Dis-Chem Hyperspeeds Performance with Hitachi HCI.

Lee Engelbrecht

Technical Manager, Dis-Chem

Read Customer Innovation Read Customer Innovation
SFS Group

SFS Group Advances Digitization with High Performance Private Cloud.

Urs Lüchinger

Head of IT Infrastructure Backend, SFS Group

Read Customer Success Read Customer Success

Bengalla Mining Company makes big productivity gains.

Cam Halfpenny

General Manager, Bengalla Mining Company

Read Customer Success Read Customer Success

Specifications

Explore wide range of configuration options to architect the right-sized HCI cluster

Print Specifications
UCP HC V124N
Configuration All-NVMe flash (Intel Select Solutions* verified)
Form Factor 1 unit (U), 1 node
Processor

Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W)

Raw Storage, per Node 3-80TB
Estimated Usable Capacity 5-210TB
Memory (traditional DIMMs, DDR4) Up to 3.0TB per node
Memory, (Intel Optane DC Persistent Memory 6TB (12 x 512GB) DCPMM with up to  1.5TB  (12 x 128GB) DDR4 Cache
Cache tier Intel Optane SSD DC P4600 (1.6TB) or P4800X 375GB or 750GB
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V225G
Configuration All-flash, general purpose (GP) GPU-enabled
Form Factor 2U, 1 node
Processor

Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W)

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W)

Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W)

Or
One or four GP GPU Nvidia Tesla M10
Or
Nvidia Tesla P40
Or
Nvidia Tesla V100 (16GB or 32GB)
Or
Nvidia Turing T4 Tensor Core

Raw Storage, per Node 4-47TB
Estimated Usable Capacity 6-124TB
Memory (traditional DIMMs, DDR4) Up to 1.5TB per node
Memory, (Intel Optane DC Persistent Memory N/A
Cache tier 1x or 2x Intel : Intel SSD DC S4600 960GB
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as  Cisco Nexus or any  other switch that meets vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2,000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V220F
Configuration All-flash
Form Factor 2U, 1 node
Processor

Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W)

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W)

Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W)

Raw Storage, per Node 2-193TB
Estimated Usable Capacity 204-328TB
Memory (traditional DIMMs, DDR4) Up to 3.0TB per node
Memory, (Intel Optane DC Persistent Memory 6TB (12 x 512GB) DCPMM with up to  1.5TB  (12 x 128GB) DDR4 Cache
Cache tier Up to 8TB Intel SSD DC  P4600 (NVMe) or up to 3.75GB Intel Optane SSD DC P4800X
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as  Cisco Nexus or any  other switch that meets vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2,000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V120F
Configuration All-flash (Intel Select Solutions* verified)
Form Factor 1U, 1 node
Processor

 Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W)

Raw Storage, per Node 4-77TB
Estimated Usable Capacity 7-200TB
Memory (traditional DIMMs, DDR4) Up to 3.0TB per node
Memory, (Intel Optane DC Persistent Memory 6TB (12 x 512GB) DCPMM with up to  1.5TB  (12 x 128GB) DDR4 Cache
Cache tier Intel Optane SSD DC P4800X Series (375 or 750GB, 2.5 in.,. U.2)
or
800Gb - 1.6TB NVMe SSD
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as  Cisco Nexus or any  other switch that meets vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2,000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V120
Configuration Hybrid
Form Factor 1U, 1 node
Processor

Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Platinum 8276L (28 cores, 2.20 GHz, 165W)

Raw Storage, per Node 2-18TB
Estimated Usable Capacity 1-9TB
Memory (traditional DIMMs, DDR4) Up to 3.0TB per node
Memory, (Intel Optane DC Persistent Memory 6TB (12 x 512GB) DCPMM with up to  1.5TB  (12 x 128GB) DDR4 Cache
Cache tier 1-2 x 960GB
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as  Cisco Nexus or any  other switch that meets vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2,000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V220
Configuration Hybrid
Form Factor 2U, 1 node
Processor

Intel Xeon Silver 4210R (10 cores, 2.4 GHz, 100W) 

Intel Xeon Gold 6256 (12 cores, 3.60 GHz, 205W)

Intel Xeon Gold 6226R (16 cores, 2.90 GHz, 150W)

Intel Xeon Gold 6240R (24 cores, 2.40 GHz, 165W)

Intel Xeon Gold 6242R (20 cores, 3.10 GHz, 205W)

Intel Xeon Gold 6248R (24 cores, 3.00 GHz, 205W)

Raw Storage, per Node 12-64TB
Estimated Usable Capacity 6-32TB
Memory (traditional DIMMs, DDR4) Up to 3TB per node
Memory, (Intel Optane DC Persistent Memory 6TB (12 x 512GB) DCPMM with up to  1.5TB  (12 x 128GB) DDR4 Cache
Cache tier 480GB SATA SSD (1x to 4x) or 960GB SATA SSD (1x to 4x)
Network

Up to 4 x 10/25 GbE SFP+; or  up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 2 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X5 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as  Cisco Nexus or any  other switch that meets vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V124N G2
Configuration All-NVMe flash SFF form factor
Form Factor 1 unit, 1 node
Processor

Intel Xeon Silver 4310 (12c, 2.1GHz, 120W)

Intel Xeon Gold 5320 (26C, 2.2GHz, 185W)

Intel Xeon Gold 6342 (24C, 2.8GHz, 230W)

Intel Xeon Gold 6348 (28C, 2.6GHz, 235W)

Intel Xeon Gold 6338 (32C, 2.0GHz, 205W)

Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W)

Raw Storage, per Node 0.96TB - 76.8 TB
Estimated Usable Capacity 2.52TB - 202TB
Memory (traditional DIMMs, DDR4) Up to 4.0 TB per node
Memory, (Intel Optane DC Persistent Memory 2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) 
DDR4 Cache
Cache tier Intel Optane SSD P5800 (800GB)
Network

Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V120F G2
Configuration SSD flash SFF form factor
Form Factor 1 unit, 1 node
Processor

Intel Xeon Silver 4310 (12c, 2.1GHz, 120W)

Intel Xeon Gold 5320 (26C, 2.2GHz, 185W)

Intel Xeon Gold 6342 (24C, 2.8GHz, 230W)

Intel Xeon Gold 6348 (28C, 2.6GHz, 235W)

Intel Xeon Gold 6338 (32C, 2.0GHz, 205W)

Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W)

Raw Storage, per Node 0.96TB - 76.8 TB
Estimated Usable Capacity 2.52TB - 202TB
Memory (traditional DIMMs, DDR4) Up to 4.0 TB per node
Memory, (Intel Optane DC Persistent Memory 2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) DDR4 Cache    
Cache tier Intel Optane SSD P4610 (1.6 TB)
Network

Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as Arista, Cisco Nexus or any other switch that meets VMware vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node
UCP HC V224N G2
Configuration All-NVMe
Form Factor 2U, 1 node
Processor

Intel Xeon Silver 4310 (12c, 2.1GHz, 120W)

Intel Xeon Gold 5320 (26C, 2.2GHz, 185W)

Intel Xeon Gold 6342 (24C, 2.8GHz, 230W)

Intel Xeon Gold 6348 (28C, 2.6GHz, 235W)

Intel Xeon Gold 6338 (32C, 2.0GHz, 205W)

Intel Xeon Platinum 8368 (38C, 2.4GHz, 270W)

Raw Storage, per Node 2TB - 120TB
Estimated Usable Capacity 5.26TB – 315.6TB
Memory (traditional DIMMs, DDR4) Up to 4.0 TB per node
Memory, (Intel Optane DC Persistent Memory 2TB (16 x 128G) DCPMM with up to 2TB (16 x 128G) DDR4 Cache
Cache tier Intel Optane SSD P5800 (800GB)
Network

Up to 8 x 10/25 GbE SFP+; or up to 8 x 10 GbE RJ45 or SFP+; or mix of 4 x 10 and 4 x 25GbE

2 x 100/50/40/25 GbE port Mellanox Connect X6 EN dual port

Management Network One 1Gb/s BMC port
Network Switch Support Customer supplied switch such as Arista, Cisco Nexus or any  other switch that meets VMware vSAN requirements
Maximum Node per Cluster 64
Maximum Nodes Manageable per VMware vCenter 2000
Minimum Initial Order 2 node (minimum 4 nodes for Intel Select Solutions*)
Node Increment 1 node

Resources & Insights

MIT Technology Review: IT Strategies for Hybrid Cloud

Automated HCI: An Ideal Match for Your Hybrid Cloud

Leveraging Hyperconverged Infrastructure to Accelerate Data Center Agility & Hybrid Cloud Workflows

Optimizing Your Hybrid Cloud with VMware

Provide desktops anywhere and make your users smile

Explore Simple, scalable and secure turnkey hybrid cloud infrastructure.

VMware Horizon View with Graphics Acceleration on Hitachi Unified Compute Platform HC Horizon Fast Track Certified

SAP HANA on Hitachi Unified Compute Platform HC

Multi-cloud Container Platform with Hitachi Unified Compute Platform RS and VMware Tanzu Reference Architecture Guide

Automate Life-Cycle Management With Hitachi HCI

Frequently-asked-questions

Hitachi Vantara Introduces Solutions to Simplify Private Cloud and Seamlessly Extend Data Services To The Hybrid Cloud

video-icon

An overview of Hitachi Unified Compute Platform HC

Next-generation VDI powered by Hitachi HCI

video-icon

Modernize hybrid cloud infrastructure with Hitachi hyperconverged infrastructure 

Get Started with Hitachi hyperconverged solution

Transform IT with a proven HCI solution

Connect with best-in-class experts to design an HCI solution that fits YOUR application needs.
pentaho-business-analytics-9.3.0.0-428-x64.exe
pentaho-business-analytics-9.3.0.0-428-x64.bin
pentaho-business-analytics-9.3.0.0-428-x64.app.tar.gz
pentaho-bdvm-7.1.0.0-33-dist.zip
The trial download cannot be installed on mobile devices.
Send yourself a reminder email. We will send you a link to the free trial that you can click the next time you are at your computer.
/en-us/products/lumada-dataops/data-integration-analytics/request-demo/request-demo-ty.html#thankyou
/en-us/products/lumada-dataops/data-integration-analytics/tutorials.html#thankyou
/en-us/products/lumada-dataops/data-integration-analytics/download-unavailable
Download Pentaho
SUBMISSION AGREEMENT
I confirm that the information being provided for submission is complete, true and accurate to the best of my knowledge.
{ "FirstName": "First Name", "LastName": "Last Name", "Email": "Business Email", "Title": "Job Title", "Company": "Company Name", "Address": "Address", "City": "City", "State":"State", "Country":"Country", "Phone": "Business Telephone", "LeadCommentsExtended": "Additional Information(optional)", "LblCustomField1": "What solution area are you wanting to discuss?", "ApplicationModern": "Application Modernization", "InfrastructureModern": "Infrastructure Modernization", "Other": "Other", "DataModern": "Data Modernization", "GlobalOption": "If you select 'Yes' below, you consent to receive commercial communications by email in relation to Hitachi Vantara's products and services.", "GlobalOptionYes": "Yes", "GlobalOptionNo": "No", "Submit": "Submit", "EmailError": "Must be valid email.", "RequiredFieldError": "This field is required." }
en